Fence guide

Getting accurate fence bids: what to send

Fence and gate numbers come back faster and tighter when the bid invite answers the questions every fence sub will ask. Here is the short list.

Get a Free EstimateQuick Quote

Documents

  • Site plan with the fence and gate scope marked
  • Fence, gate and enclosure detail sheets
  • Spec sections for fencing and gates
  • All addenda that touch site layout

Gate details

Gates drive cost and lead time. Give each one a line: type (swing, slide, cantilever), clear opening, height, hardware, and whether it gets an operator. If it is automated, say who provides the operator, power, loops and access control.

Site and schedule

  • Bid due date and how to submit
  • Anticipated start and whether fencing is phased (temporary first, permanent later)
  • Who does grading, curbs and gate track pads
  • Existing fence to remove
  • Known utility conflicts

Requirements

  • Insurance limits and additional insured wording
  • Bonding, if required
  • Onboarding forms and vendor registration
  • Public work requirements, if any
  • Closeout deliverables

What you get back

A proposal with clear inclusions, exclusions and clarifications that drops straight into your bid leveling sheet. Download our commercial bid request checklist.

Quick answers

How much lead time should I give a fence sub?

As much as you can. A week or more for a straightforward scope; more for complex gates or automation.

Can I send plans through your website?

Yes, PDFs or images through the commercial bid request form. Do not send controlled or sensitive government documents through the site.

☎ Call NowFree Estimate